官方已公开的信息
- 项目编号
- 38189-022
- 发布机构
- Asian Development Bank (ADB)
- 项目地点
- Timor-Leste
- 发布日期
- 2008年3月5日 00:00
- 截止日期
- 2016年8月25日 00:00(已过截止日)
- 当前状态
- completed
官方原文摘录
The Project will (i) check, and refurbish, replace and install (as required) up to 35 primary and secondary distribution master meters; (ii) check and replace, as necessary, up to 51 kilometers of tertiary distribution (reticulation) water pipes; (iii) check and replace, as necessary, up to 2,950 household meters and 240 commercial and bulk meters; (iv) check and normalize, as necessary, up to 5,100 household connections and up to 170 commercial connections; (v) relocate up to 1,700 existing water service connections to allow the disconnection of up to 7,000 linear meters of old asbestos cement and other water mains; (vi) install up to 88 new stop valves; (vii) refurbish or replace nine chlorination dosing units at deep bores; (viii) undertake practical minor repairs to support operational efficiency and safety; (ix) train and support a Dili water demand management task force; (x) establish and give in-field mentoring for three leak detection teams; and (xi) train six subzone caretakers. The Project is being proposed under a sector modality.